Microsoft

Automatic requirement traceability with Exploratory Testing

Apr 11, 2012Nitin Gurram
Automatic requirement traceability with Exploratory Testing
SummaryAI, from the source post

This post details how Microsoft Test Manager automatically builds test plans during exploratory testing sessions. When a user explores a backlog item, the system automatically creates test cases and bugs, which are then added to a requirement-based suite within the test plan. This eliminates manual test case creation and organization, saving effort and ensuring that test plans are dynamically updated with the results of exploratory testing.

More from the Visual Studio Extension Manifest Configuration trail