How the data center site selection process works at Dropbox

This post details Dropbox's data center site selection process, which involves defining resource requirements (power, space, time) based on capacity engineering assessments. It outlines the RFP process, focusing on facility-level requirements like supporting infrastructure design (Tier III), cabinet weight, and network design (ingress/egress, carrier availability, redundancy). A significant emphasis is placed on sustainability and Power Usage Effectiveness (PUE) as a cost multiplier and driver for efficiency. The process includes technical questionnaires to assess detailed aspects of the facility and in-person site walks to validate information and uncover potential issues. Facilities are then scored on key parameters like space, power, and network design, with a focus on reliability and efficiency.
More from the Server Hardware Architecture trail
- Seventh-generation server hardware at Dropbox: our most efficient and capable architecture yet
- After four years of SMR storage, here's what we love—and what comes next
- A look inside our sixth generation of server hardware
- RunBMC: OCP hardware spec solves data center BMC pain points
- Automating Datacenter Operations at Dropbox