
11/19/2025
What this post added
Details the deployment of Figure 02 at BMW for sheet-metal loading, including KPIs (cycle time, placement accuracy, interventions) and technical challenges. Highlights hardware reliability learnings, specifically the re-architecture of the forearm subsystem to improve reliability and simplify thermal management for Figure 03.